TUESDAY. NOVEMBER 24. 2020   
www.irdsnepal.com.np   
 
 
EXPERIENCE
 
OVERALL EXPERIENCE OF THE FIRM
 
SN
Project Title
Client
District
Major Components of Services
 
1.  Feasibility Study of DTW Cluster in Tilkane area of Kanchanpur District Ground Water Irrigation Project /DoI Kanchanpur Survey, Design & cost estimate  
2.  DTW-Design Development and Installation of Electro-Mechanical Works RWSSFDB Jhapa Sunsari, Siraha, Shaptari, Morang , Itahari Field visit and interaction/ discussion in community/ SO; Data collection and verification; report writing and submission.
3.  Field Monitoring Support Workshop Crop Diversification Project /DoA Kailali Conduction of Workshop, Interaction/ Discussion
4.  Regional Level Working Meeting, Project Level Meeting Crop Diversification Project /DoA Kanchanpur Interaction/ Discussion; Data Collection and Verification, Meeting in Project Level.  
5.  Comparative Assessment of Private Public Approach Adopted in the Project and Its Immediate Impact on Poverty Reduction Crop Diversification Project (CDP) Darchula,Doti,
Acham Kailali, Banke, Pyuthan, Dang,Surkhet
Increase farmers’ income by promoting production and marketing of agricultural crops with particular focus on secondary crops (except Paddy and Wheat) in project areas.    
6.  An Assessment of Effectiveness of Client Oriented Research undertaken in the project by NARDEF Crop Diversification Project (CDP) Darchula,Doti,
Acham Kailali, Banke, Pyuthan, Dang,Surkhet
Assess effectives of client- oriented research in the CDP through National Agriculture Research and Development Fund.
7.  12 Nos of TW Design, Estimate and construction Supervision in Ranjha, Nepaljung DWSS, Nepaljung under Sushil Construction Nepaljung Collect Data/information, review reports, evaluation and assessments and prepare case histories including designing DTW and supervision of the TW installation.
8.  TW Design, Estimate and Supervision in Nepaljung, Ranjha Under Civil Aviation Airport CAN, Ranjha, Nepaljung Collect Data/information, review reports, evaluation, and assessments and prepare case histories including designing DTW and supervision of the TW installation.
9.  TW Design, Estimate, survey and Construction Supervision Pokhara Industrial Estate Pokhara Collect Data/information, review reports, evaluation and assessments and prepare case histories including designing DTW and supervision of the TW installation.  
10. Study on Techno -Economic Clearance of Water Related Infrastructure Project Water and Energy Commission Secretariat (WECS) Kathmandu Prepare a TOR for developing procedural guidelines for issuing techno - economical clearance of water resources related projects including water supply as addressed by per the National Water Plan.
11. Monitoring and Evaluation of Batch V, VI & VII Schemes (Package 8) Rural Water Supply and Sanitation Fund Development Board [RWSSFDB] Banke, Kailali,
Kanchanpur, Dadeldhura, Doti, Acham,
Baitadi, Darchula,
Bajang & Bajura
Compliance and Process Monitoring and evaluation of Batch V, VI and VII schemes of Mid & Far-Western Region and pre-feasibility assessment and site appraisal of Batch VII schemes.Reportpresentation. To verify the adequacy and quality of water the proposed source and to collect other necessary technical Data required for appraisal for the scheme.
12. GIS Mapping GWRDP/ DOI Bardiya Collection of the Global Positioning System (GPS) co-ordinates and elevation of each STWs. Find the location of the STWs using GPS. Collection of the data of static ground water level and discharge of the wells. Collection of the data of well design (length of screen and its depth). Preparation of location map (spatial distribution) of the STWs of the study area. Preparation of digitized contour, road network, drainage, land used and VDC boundary maps of the project area.  
13. Baseline Survey of  Bardiya District HHs  GWRDP/ DOI Bardiya Carry out the base line survey covering tentatively 10 TW clusters and 100 households of Bardiya district.  
14. Refresher Training on Implementation of Small Scale Irrigation Schemes for JT/JTAs Crop Diversification Project (CDP) Banke Refresh 50 selected JT/JTAs in two lots, develop training course that include relevant topics/subjects, produce fully capable manpower to solve the likely implementation problems on small scale irrigation projects, including operation and maintenance.
15. Institutional Development and Strengthening Training for Water Users Association ParaCon/ Community Groundwater Irrigation Sector Project (CGISP) Janakpur Conduction of Institutional Development and Strengthening Training Program for Water Users Association under Community Groundwater Irrigation Sector Project,
16. Institutional Development and Strengthening Training for Water Users Association IRDS/Community Groundwater Irrigation Sector Project (CGISP) Janakpur Conduction of Institutional Development and Strengthening Training Program for Water Users Association under Community Groundwater Irrigation Sector Project,  
17. Situation Analysis and Baseline Survey of Proposed Community Based Primary Health Care Project Nepal Red Cross Society (NRCS) Sunsari & Solukhumbu Identification of comparatively more vulnerable VDC to implement CDP based on given criteria using SMART indicators. Record and documentation the pre-project situation of selected area with demographic and socio-economic characteristic & information on water, health, sanitation, education & others.
18. Institutional Development and Improvement Training Program CGWISP, Project Management Unit, Janakpur Conduction of Training Program for Institutional Development and Improvement under Community Groundwater Irrigation Sector Project
19. Vulnerability Study of GW Resources in Parsa-Bharatpur of Chitwan Valley GWRDB, Groundwater Resource Development Project, MOWR Chitwan/ Bharatpur Assessment of the potential vulnerability of deep aquifers or GW resource and environment situation along Bhandara/ Parsa to Chitwan/ Bharatpur line.
20. Well Inventory Work in Kathmandu Valley GWRDB, Groundwater Resource Development Project, MOWR Kathmandu Collection of TW data/ information from the existing projects/ program and update/ upgrade the inventory & TW database of the Kathmandu Valley and also evaluation/ assessment of the present status of the wells and GW situation after 1998 till present.
21. Monitoring and Quality Assurance services of Solar PV Systems in Nepal – IV th Round AEPC/ Energy Sector Assistance Programmer (ESAP), DANIDA Kaski, Palpa, Myagdi, Lamjung, Gorkha, Makwanpur,
Manag, Sindhupalchowk, Terathum,
Sankhuwasabha, Udaypur, Dolpa, Kailali,
Kanchanpur, Baitadi
and Taplejung
Reporting on findings of post installation, monitoring & evaluation of Solar Home System, Provide feed back on salient features and requirements of NIPQA achieved through monitoring of Solar PV Systems in the field, Recommendations on possible improvements of the post installation monitoring and evaluation process for rural areas
22. District Area Resource Potential, Socio Economic and Market Survey MEDEP/ UNDP Darchula and Kailali Determine the most potential market centers for micro-enterprise creation and development based on market opportunities, potential of sectors/ sub-sectors, area resource potential and need, interest/ potential of the low-income people.
23. Low Flow Study of Eastern Terai Rivers Department of Hydrology and Meteorology Mechi, Koshi,
Sagarmatha and
Janakpur
Assess the availability of dry season flow in the Eastern Terai rivers at specified locations (40 rivers) based on the dry season discharge measurement. The study areas were confined to forty sites of EDR.
24. Evaluation and assessment study of Gyankhel Water Supply Project NWSC/GDC Kathmandu HH survey, Collect demand of water, Tapstand group data, Socio-economic Survey, Assessment on existing tap water system  
25. Development of Training Software with Student Information System & Data Entry Works   Nepal Academy of Tourism & Hotel Management, Ministry of Culture Tourism and Civil Aviation Kathmandu Development of Training Software for maintaining the information of approximately nineteen thousand students and teachers. The job also includes the data entry work on the basis of developed Training Software. The software is developed in the platform of Microsoft Access as a back-end and Visual Basic as the front-end tool.  
26. Monitoring and Quality Assurance services of Solar PV Systems in Nepal – IIIrd Round AEPC/ Energy Sector Assistance Programme (ESAP), DANIDA Tanahu, Lamjung, Nawalparasi,
Panchthar, Bhojpur ,Taplejung,
Jumla, Gulmi &
Darchula
Reporting on findings of post installation, monitoring & evaluation of Solar Home System, Provide feed back on salient features and requirements of NIPQA achieved through monitoring of Solar PV Systems in the field, Recommendations on possible improvements of the post installation monitoring and evaluation process for rural areas.  
27. Study on Impact of Open Fertilizer Distribution Policy on Nepalese Agricultural Sector – with EastConsult Directorate of Economic Analysis and Statistics, DOA   Study on Impact of the open fertilizer distribution policy on the various contexts e.g. socio-economic, geographical etc. Analysis of the supporting and impeding factors for the attainment of the target perceived by the open distribution policy, Necessary measures for realizing the objectives perceived by the open distribution policy during the Tenth Plan period
28. Kathmandu Valley Water Management Support Project (ADB TA No. 4096-NEP) with ERM Consortium, Mott MacDonald, Blakes, NepalConsult & TAEC Consult ADB Kathmandu Help the government to carry out the overall sector reform that is required to improve the water supply and sanitation services in Kathmandu Valley on a sustainable basis. The sector reform comprises institutional reforms, including establishment of the National Water Supply Regulatory Board (NWSRB) and the Kathmandu Valley Water Authority (KVWA), and introduction of a Private Sector Participation (PSP) scheme with recruitment of a Private Operator (PO). The Project is closely linked to the enhanced bulk water supply under the Melamchi Water Supply Project, which expected to become available in 2008.
29. Feasibility Study of Small Size Solar Home System AEPC/ Energy Sector Assistance Programme (ESAP), DANIDA   Assessment of the technical reliability of less than 10 Wp SHS with white LED lamps as well as users’ acceptability & product safety. Carry out the cost-benefit analysis and price trend analysis. Exploration of similar experiences in other countries through literature survey, including websites & interviews. Recommend specific and practical ways to make SHS affordable and accessible to rural poor.
30. Feasibility Study of Geothermal Energy Application in Nepal (Manang District) Alternative Energy Promotion Centre (AEPC), Ministry of Science & Technology Manang Investigation, mapping, database preparation, current status of geothermal water in Manang District of high potential of Geothermal Energy, Complete physical and chemical assessment of water, survey any possible link to therapeutic & recreational uses, Identifying the different locations of Hot water in the districts
31. Feasibility Study of Geothermal Energy Application in Nepal (Mustang & Myagdi District) Alternative Energy Promotion Centre (AEPC), Ministry of Science & Technology Mustang & Myagdi Feasibility study and identification of the different location of the hot water in the two districts Mustang and Myagdi and study how the sources of the hot water can be utilized for community/ Rural Development
32. Monitoring and Quality Assurance services of Solar PV Systems in Nepal –IInd Round AEPC/ Energy Sector Assistance Programme (ESAP), DANIDA Khotang, Udaypur,
Sindhuli, Ramechap, Okhaldhunga, Sarlahi, Rautahat, Makwanpur Dhading, Gulmi, Argakhanchi, Baglung, Pyuthan, Humla &
Syangja
Reporting on findings of post installation, monitoring & evaluation of Solar Home System, Provide feed back on salient features and requirements of NIPQA achieved through monitoring of Solar PV Systems in the field, Recommendations on possible improvements of the post installation monitoring and evaluation process for rural areas.,
33. Groundwater Training Program for Batch-IV (Groundwater Schemes) Rural Water Supply and Sanitation Fund Development Board [RWSSFDB] Janakpur Theoretical & Practical training for TW installation, Log form orientation, Record keeping system of GW & O&M of TW/DW schemes to community worker (CW) & Support Orgn (SW) of Janakpur District
34. Evaluation of Community Based Disaster Preparedness (CBDP) Program   Nepal Red Cross Society (NRCS) Banke, Bardia,
Morang, Sunsari, Bhojpur,
Khotang,Sakhuwasabha,
Nawalparasi, Syangja
Program Evaluation in 9 district) Assess the activities conducted under CBDP program, evaluate and draw out the impact of the program laid in the communities, recommend modifications in modus operandi of the CBDP program, PRA, Draw the common feature ie socio-economic, community organizations, traditional trait etc of the program implemented community, Draw out the plan of action (Project design, implementation process, project activities, Project cycle, community participation methodologies etc)
35. Groundwater Study and Training For Execution of Groundwater Schemes For Rural Water Supply and Sanitation in Terai and Inner Terai Rural Water Supply and Sanitation Fund Development Board [RWSSFDB] Chitawan, Makawanpur, Investigation on hydro-geology and nature of aquifers for TW construction in the area and produce hydro-geological maps for pre development and implementation activities, Reduce the chances of failure of tubewell scheme for future program, Identification of the feasible area for TW scheme Preparation of a adequate guideline for TW survey, construction and installation, Adequate typical design for TW, DW for water supply schemes  
36. Detail Feasibility Study of Bhagwanpur-Ama Deep tubewell Cluster IRRIGATION Subproject GWRDB, GFO Butwal  Rupandehi Hydrological survey & mapping for getting information on aquifer systems, groundwater quality, Quantity & groundwater fluctuation. Preparation of hydro-geological map. Design of TWS system, pump, motor, electrification, upvc distribution system. Topographic and longitudinal survey of canal/ upvc pipe line alignment. Socio-economic survey. Agriculture development policy assessment. Study on existing farmer organization, interaction and their cooperation in participatory approach & preparation of social map. Assessment of the initial environment examination (IEE) of the proposed groundwater cluster. Identify groundwater quality for irrigation/drinking purpose. Computation of EIRR. Preparation of field, draft and final DFS report.  
37. Monitoring and Quality Assurance services of Solar PV Systems in Nepal –Ist Round AEPC/ Energy Sector Assistance Programme (ESAP), DANIDA Taplejung, Ilam,
Panchthar, Terathum, Dhankuta, Bhojpur,
Khotang, Udaypur, Solukhumbu, Sankhuwasabha,
Rautahat, Gorkha,
districts
Reporting on findings of post installation, monitoring & evaluation of Solar Home System, Provide feed back on salient features and requirements of NIPQA achieved through monitoring of Solar PV Systems in the field, Recommendations on possible improvements of the post installation monitoring and evaluation process for rural areas.
38. Study on Groundwater Development, Management and Performance under different Projects/ Programs – in assoc. With East Consult SMTP, Irrigation Management Division, DOI, Ministry of Water Resources   Asses the present level of GW development and management, utilization and performance level of the TWs, Asses the successful/failure level, comparative study on technology, implementation and management variability between different project/programs, Forecast the future performance of the tubewells Recommend measures for betterment/ improvement in performance.  
39. Monitoring Well Rehabilitation Melamchi Water Supply Project Kathmandu Construction supervision, Sampling, Testing & Reporting
40. Design, Supervision, Compilation and Report Preparation on Monitoring Well in KTM Valley Melamchi Water Supply Project Kathmandu Construction supervision, Sampling, Testing & Reporting  
41. Urban Water Supply Reforms in Kathmandu Valley Metcalf/ CEMAT Kathmandu Well Inventory, GIS Mapping locality wells with GPS & reporting
42. Groundwater STW Feasibility Study in Reikabar VDC of Kanchanpur District GWRDB, GFO/APP Kanchanpur Study/assess shallow aquifer system. Identification of type, depth and extent of aquifer system, groundwater quality, quantity, fluctuation and movement. Low cost designs, and estimate, Preparation of hydrographs and water table map and distribution system. Water balance and safe yield in the cluster. Participatory approach for implementation. Environmental aspect like water logging, any hazards, pollution and drainage system in the area.  
43. Study on optimum utilization of tubewells for irrigation in Central and Eastern Development Region WECS and WIDP/ Canadian Water & Energy Commission CWEC   Investigate and study of TW use in EDR&CDR, find out various constraints and recommend measure for optimum level. Assessment on crop-wise use of TWs. Prepare case studies of 45TWs. Organize workshop with concerned stakeholders/ experts. Formulate policy/ strategy.
44. Gangkhel Water Supply Project Gangkhel Development Center Kathmandu Survey, Design of Distribution Networks & Supervision  
45. A Study to Ascertain Groundwater- Status and related Socio-economic situation in PLAN IDE, Plan International Sunsari and Morang Socio-economic and environment Groundwater Condition Tendency and attitude of the communities in EDR  
46. Study on Production, Use and Environmental impact of Methane Gas from Garbage including sampling and testing of Methane Gas in Gokarna landfill site WECS Kathmandu Analysis of waste quantities and waste composition aspects, Gas production, Quantification of Dump volume, Leachate production and its potential contamination of groundwater, Sampling, testing, chemical analysis and measurement at site, Ascertain quality and quantity of gas, Study on Environmental and social implication of the production and utilization of the methane gas distribution viability.
47. Detail Feasibility Study of Rehu Khola Irrigation Project MWDR/ DOI   Design & costing. Analysis of social, socioeconomic and environmental situation of the project area.  
48. Landslide studies in flood affected areas – in assoc with EGEC. DPTC/JICA*   Landslide studies & Mapping in rural/ Hill and communities in Palung District  
49. Primary Environmental Impact Assessment (EIA) of Khando Irrigation Sub Project, Saptari-in assoc. With EGEC NISP/ DOI* Sapteri Study Overall impression of the field conditions, Basic data collection from all possible secondary sources, analysis, planning/ programming for the field work, examine and verify by field measurements all relevant environmental parameters.  
50. Primary Environmental Impact Assessment (EIA) and evaluation of Darshantar Irrigation Sub Project, Nuwakot. NISP/DOI* Nuwakot Identify the present water use of the irrigation source, assessment of drainage condition of the command area, Identify the uses of irrigation system, constraints and problem like floods, analysis of silt problem of river, analysis of negative implication on the flora and fauna, suggest on the improvement of local environment
51. Landslide studies Installation/ supervision of Landslide measuring equipment at Okharpauwa village DPTC/JICA Nuwakot Installation of extensometer, reading and reporting
52. Urban Water Supply and Sanitation Rehabilitation Project for Outside the Valley Towns World Bank/ IDA – Hyundai 9 Sub Metropolitan
outside vallery
Survey, Investigation, Mapping, Well Development and Testing  
53. Groundwater Investigation and environment for East Rapti Irrigation Project. DOI, Chitwan*   Investigation on the groundwater potential and environment in the northern part of the ERIP–area covering approximately 50 Km2 conductance of geological, geophysical and hydro-geological studies as well as drilling, Installation and development of  six number of wells.